R&M was responsible for planning, design, FERC licensing and construction administration for reconstruction of a flood damaged 1250 MW hydroelectric facility. The reconstruction included a new penstock, 430’ long penstock tunnel, a new intake/diversion structure, reconstructed access to the intake/diversion structure and reconstruction of the existing powerhouse turbines and controls.