R&M was responsible for a feasibility study to modify an existing ore terminal to handle 600,000 tons of zinc and lead concentrate on an annual basis. The study examined the feasibility and costs for a new ore concentrate building, new dust control/collection systems, new motors, controls, belts and feeders for an existing conveyor system, a new radial shiploader and associated miscellaneous support facilities.